6224 FORSYTH BLVD
| Application date | Apr 27, 2026 |
|---|---|
| Issue date | Jul 14, 2026 |
| Days to issue | 78 |
| Estimated cost | $9,271,000 |
| Project type | New Const. |
| Structure type | 34 |
| First seen | 2026-07-15 11:26:10 |
Description
An Innovation Hub is being added to Forsyth's campus. It is a metal stud, masonry veneer building that has a storm shelter in the basement, elevator, and connects to two existing buildings on campus. The site and demo drawings for the project were originally submitted on 3/25/26 under application AB-5248-26. The addendum drawings have been included here for reference as well.