4600 GOODFELLOW BLVD
| Application date | Jul 12, 2026 |
|---|---|
| Issue date | Jul 22, 2026 |
| Days to issue | 10 |
| Estimated cost | $46,000 |
| Project type | Alteration |
| Structure type | 34 |
| First seen | 2026-07-23 14:22:24 |
Description
A CMU exterior wall collapsed on the NE corner of the building. We will rebuild the wall with structural studs and an exterior metal panel to enclose the building once again. There will be two overhead doors installed to replace the existing doors that were there before the storm.